DW/Co. × MBO Ventures v2 Engagement
May 12, 2026
DWDW/Co.
×
MMBO Ventures

MBO Ventures v2 — workspace.

Active deliverables for the v2 rebuild: off WordPress, onto the DW/Co. platform, repositioned from ESOP-centric to a broader business transition + exit advisory. Each deliverable below is reviewable as a self-contained URL — open one to leave feedback.

Engagement
v2 rebuild · Foundation + 5 add-ons · Care Plus
Target launch
June 12, 2026
Content partner
Agency Engine (Ian)
Decision needed
Pick scope · review v0

Scopes of work

2 options · decision needed

Active deliverables

1 live · 2 queued (under v2)
Live · awaiting feedback
00 / Directional

v0 — Directional

Four homepage directions across distinct visual postures — quiet authority, bold manifesto, warm editorial, atmospheric. Same v2 copy across all four. Visual context for what v2 (scope B) could look like.

Open directional
Queued · after v0 lock
01 / Wireframes

v1 — Page-level wireframes

Internal graybox wireframes for all 11 pages (home + 6 service pages from Agency Engine briefs + 4 migrated). Locked structure before visual application.

Not yet available